图片名称

Bojing News

Precautions for installation and use of reactor

2021-09-15

Author:

Pageviews:


Precautions for reactor installation and use:
1. The autoclave should be placed indoors. When multiple autoclaves are equipped, they should be placed separately. Each operation room should have an exit directly leading to the outdoors or passages, and the equipment location should be well ventilated.
2. When installing the kettle cover, prevent the sealing surfaces between the kettle body and the cover from colliding with each other. Place the kettle cover carefully on the kettle body according to the fixed position. When tightening the main nut, it must be tightened diagonally and symmetrically several times. The force should be even, and the lid of the kettle should not be tilted to one side to achieve a good sealing effect.
3. At the connection of the positive and negative nuts, only the positive and negative nuts are allowed to rotate. The two arc sealing surfaces must not rotate relative to each other. When all the nut pattern connectors are assembled, they should be coated with lubricating oil.
4. The needle valve is tightly sealed. It only needs to gently rotate the valve needle and press the cover tightly to achieve a good sealing effect.
5. Rotate the revolving body on the kettle by hand to check whether the operation is flexible.
6. The controller should be placed flat on the operating table. The working environment temperature is 10-40℃, the relative humidity is less than 85%, and the surrounding medium does not contain conductive dust or corrosive gas.
7. Check whether the movable parts and fixed contacts on the front panel and rear panel are normal, remove the upper cover, and check whether the contact of the connector is loose, and whether there is damage or corrosion caused by improper transportation and storage.
8. After the operation, it can be cooled by natural cooling, water cooling or air cooling on the support. After the temperature drops, release the pressurized gas in the kettle to reduce the pressure to normal pressure (the pressure gauge shows zero), then loosen the main nut symmetrically and evenly, then remove the main nut, and then carefully remove the kettle cover and place it in On the stand.
9. After each operation, the residue on the kettle body and the kettle cover should be removed. The main sealing port should be cleaned frequently and kept clean. It is not allowed to wipe with hard objects or rough surfaces.

Shandong Bojing Chemical Machinery Co., Ltd. was established in 2007. It is a professional manufacturer in the field of fine chemical equipment. The company's products are mainly stainless steel, titanium, nickel, Monel and other non-ferrous materials. It is an integrated design, research and development, and manufacturing. Sexual high-tech enterprises. The core products are widely used in the treatment of waste water and waste gas in biochemical and fine chemical plants, as well as for energy conservation and efficiency enhancement. The company has pressure vessel (level D) manufacturing qualification and ASME certification issued by the General Administration of Quality Supervision, Inspection and Quarantine.

  • Service
  • Tel

    Tel

    +86186-5333-9800

  • Follow us

    Official accounts

    Follow the official account for more inspiration

  • Top
电话

Address

Wujia Industrial Park, Nanjiao Town,

 Zhoucun District, Zibo City, Shandong


Webpage Copyright© 2021 Shandong Bojing Chemical Machinery Co., Ltd.

国际站建设:中企动力 淄博 SEO